COTENAVAL made this project for the Port Authority of Tenerife and the work consisted in to determine the necesary studies in order to stablish a LNG bunkering to the Canary Islands in the short and midium terms with a reasonable price and its presentation as a TENT-T (Trans-European Transport Network) applicant the European Union. Once the aid is granted by the European Union, the second phase consist on the management and coordination of the activities of the Project.
Read moreCOTENAVAL made this project for the Port Authority of Tenerife and the work consisted in to determine the necesary studies in order to stablish a LNG bunkering to the Canary Islands in the short and midium terms with a reasonable price and its presentation as a TENT-T (Trans-European Transport Network) applicant the European Union. Once the aid is granted by the European Union, the second phase consist on the management and coordination of the activities of the Project.
Read moreCoordination of the installation of a new gas generator 1995 Kva, on the vessel “Abel Matutes” with LNG tanks with a capacity of 30m3. The generator is fully integrated into the ship’s system and has two points of bunkering.
Read more