Due to operational needs, Petrogas Company, commissioned the construction of a new asphalt vessel to the shipyard Yangzou […]
Read moreWithin the search of a better energy efficiency in its services, Balearia proposed to build a catamaran propelled […]
Read moreAfter detecting by the shipowner a loss of loading of the ship, due to various refurbishments and to […]
Read moreAfter detecting by the shipowner a loss of loading of the ship, due to various refurbishments and to […]
Read moreCOTENAVAL,as the Technical consultancy of BALEARIA, has been the responsible of the Conceptual design as well as of […]
Read moreCotenaval has collaborated in the construction of these two ferries from the negotiation phase of the contract, advising […]
Read moreCotenaval has collaborated in the construction of these two ferries from the negotiation phase of the contract, advising […]
Read moreDuring all over the vessel construction, COTENAVAL in name of the Ship-Owner, we made in Shipyard the usual […]
Read moreDuring all over the vessel construcction, COTENAVAL in name of the Ship-Owner, we made in Shipyard the usual […]
Read moreTo refloat some damaged and sunked concrete caissons because a rough weather at the Prats dock, in Barcelona, […]
Read moreTo refloat some damaged and sunked concrete caissons because a rough weather at the Prats dock, in Barcelona, […]
Read moreDuring all over the vessel construcction, COTENAVAL in name of the Ship-Owner, we made in Shipyard the usual […]
Read moreDuring all over the vessel construcction, COTENAVAL in name of the Ship-Owner, made in Shipyard the usual works […]
Read moreAfter detecting by the shipowner a loss of loading of the ship, due to various refurbishments and to […]
Read moreAfter detecting by the shipowner a loss of loading of the ship, due to various refurbishments and to […]
Read moreVessel of Petrogas company of 2004, which various studies were performed by COTENAVAL as justification of allowable work […]
Read moreVessel of Petrogas company of 2004, which various studies were performed by COTENAVAL as Procedures manual of emergency […]
Read moreSteel Project, stability calculations, and checking of the lightweight of three modular pontoons after the increase of breadth […]
Read moreBased on three existing modular pontoons,it was realized the basic project for the construction and assembly of 4 […]
Read moreStudy of operation conditions for driving piles for the construction of Duques de Alba.
Read more